Packaging Unit Speed and Damage Probability
XAT 2010 · Quantitative Ability & Data Interpretation · Hard · Quantitative Ability
The supervisor of a packaging unit of a milk plant is being pressurised to finish the job closer to the distribution time, thus giving the production staff more leeway to cater to last minute demand. He has the option of running the unit at normal speed or at 110% of normal - "fast speed". He estimates that he will be able to run at the higher speed for 60% of the time. The packet is twice as likely to be damaged at the higher speed which would mean temporarily stopping the process. If a packet on a randomly selected packaging runs has probability of 0.112 of damage, what is the probability that the packet will not be damaged at normal speed?
- A.
0.81
- B.
0.93
- C.
0.75
- D.
0.60
- E.
None of the above
B
Explanation
Let be rate at normal speed. Output in time at normal speed = . At fast speed (110%): . Proportion of output at normal speed = . Proportion at fast speed = . Let be probability of damage at normal speed. At fast speed, damage probability = . Total damage probability = . Probability of NOT damaged at normal speed = .
Related Quantitative Ability questions
- #2180Points on Line in Arithmetic ProgressionXATQADISET · 2QHard
- #2181Function Operation SummationXATQADIMCQMedium
- #2182Speed, Distance, and Relative Arrival TimeXATQADIMCQMedium
- #2183Squares Diagonal and Side Length ProgressionXATQADIMCQMedium
- #2184Clock Hands Angle Change RateXATQADIMCQEasy
- #2185Data Sufficiency QuestionsXATQADISET · 2QMedium
- #2186GP LCM Maximum SumXATQADIMCQHard
- #2187Books and More Profit AnalysisXATQADISET · 2QMedium
Practise this under exam conditions
Sign in to solve it with a live timer, the on-screen CAT calculator, and streak and accuracy tracking across every question you attempt.
Solve in the workspace