Time required for Ganesh to complete work alone

CAT 2018 Slot 2 · QA · Medium · Time & Work

Ramesh and Ganesh can together complete a work in 16 days. After seven days of working together, Ramesh got sick and his efficiency fell by 30%. As a result, they completed the work in 17 days instead of 16 days. If Ganesh had worked alone after Ramesh got sick, in how many days would he have completed the remaining work?

  1. A.

    12

  2. B.

    14.5

  3. C.

    13.5

  4. D.

    11

Answer

C

Explanation

Let daily work of Ramesh be RR and Ganesh be GG. Total work =16(R+G)= 16(R + G).

Work remaining after 7 days =9(R+G)= 9(R + G). For the next 10 days (total 17 days), Ramesh works at 0.7R0.7R and Ganesh at GG. So: 10(0.7R+G)=9(R+G)10(0.7R + G) = 9(R + G) 7R+10G=9R+9G    2R=G    G=2R7R + 10G = 9R + 9G \implies 2R = G \implies G = 2R

Work remaining after 7 days =9(R+2R)=27R= 9(R + 2R) = 27R.

If Ganesh works alone after Ramesh gets sick, time taken by Ganesh =27RG=27R2R=13.5 days= \frac{27R}{G} = \frac{27R}{2R} = 13.5\text{ days}.

Practise this under exam conditions

Sign in to solve it with a live timer, the on-screen CAT calculator, and streak and accuracy tracking across every question you attempt.

Solve in the workspace